
135 Albert Street, EV
About This Project
The levels B2/B3 EV Charger project that has been installed for the Auckland Council head office located at 135 Albert St Auckland CBD office consists of approx. 55 Schneider EV Link 7.KW EV Chargers on level B2 and approx. 62 Schneider EV Link 7.KW EV Chargers all complete with a full head end load management system to control the load required for charging such a large amount of EVs. A full new cable management system was installed to take the new cables that were required to reticulate around the existing carparking levels and a new switchboard with a mains power monitoring to interface with the load management system to assist in the control, once all installed the units were fully tested and commissioned and with the assistance of Schneider were put into use and the load management system worked well with the end Clients needs.
More Projects
WQIP Site 6
Wynyard Quarter, Auckland
Site 6 marks the 3rd stage of the Wynyard Quarter Innovation Precinct (WQIP), a transformative urban regeneration initiative developed for Precinct Properties.
View project
Munroe Lane Hub
Albany, Auckland
6-8 Munroe Lane is a premium commercial office development in Albany, featuring 1.5 basement levels and six floors of A-grade office space.
View project
University of Auckland RWC
Symonds Street, Auckland
This is a new award-winning state of the art facility in the heart of the University of Auckland Campus consisting of multi-level sports and wellness spaces for the University students to enjoy.
View project